Honda Aircraft Company has completed the first wing structure for the HondaJet Echelon test unit and now targets first flight of the light jet in 2028, with type certification and first delivery in 2031. The Greensboro, North Carolina-based manufacturer attributes the updated timeline to tier-one supplier-related schedule adjustments and ongoing development activities.
Five wing structures are now in various stages of final assembly, and mainline final assembly is targeted to begin in early 2027. Key component tests have been completed in the structural test programme. At the company's Integrated Test Facility, a fully operational cockpit test environment is supporting integration campaigns, and a second cockpit is being commissioned to evaluate key aircraft systems before the test aircraft flies. Equipment qualification is continuing in support of a safety of flight declaration. More than 70% of the parts required for first assembly are on hand, and more than 88,400sq ft has been provisioned for Echelon manufacturing.
Amod Kelkar, Senior Vice President, Chief Commercial Officer and HondaJet Echelon Program Leader, said completion of the first wing assembly was an important achievement as the company advances testing, systems integration and equipment qualification, and acknowledged that the programme had faced some schedule challenges. He said Honda Aircraft holds more than 530 signed letters of intent for the aircraft.
The Echelon is designed with a larger cabin and greater passenger capacity than the current HA-420 HondaJet, and Honda Aircraft aims for it to become the first single-pilot certified light jet with US transcontinental range. It is planned to incorporate the company's Over the Wing Engine Mount, a composite fuselage and advanced avionics, with Auto Throttle, Emergency Autoland, Autobrake, the Runway Overrun Awareness and Alerting System and the Advanced Steering Augmentation System.
Preliminary specifications give two Williams International FJ44-4C engines, seating for one crew and 10 passengers or two crew and nine passengers, a target NBAA IFR range of 2,625nm with one crew and four passengers, a maximum cruise speed of 450 knots true airspeed and a maximum cruise altitude of FL470.
The next milestone on the updated timeline is the start of mainline final assembly, targeted for early 2027.





